Page 98 - MOX STUDIO- 2017
P. 98

98                                                                                                                                                                                                                                                                                                                       99




                                                                                     2017.

               PLATINUM ROZZAQ SDN BHD,
               (TRAINING CENTER)



                LOCATION : SHAH ALAM, SELANGOR
                CLIENT :  PLATINUM ROZZAQ SDN BHD
                PROJECT SIZE : 6105SQFT


               In 2017, I was honored with the opportunity by my business partner to fully utilize
               my interior design and architecture skills on a design and build project. The proj-
               ect was for Platinum Rozzaq Training Center, located in Shah Alam, Selangor.

               The training center is operated by Platinum Rozzaq Sdn Bhd, which was previ-
               ously known as Spektrum IT Vision Training & Consultancy. This company func-
               tions as an Autodesk Training & Certification Center, providing professional
               training and certification in AutoCAD, Revit, 3DsMax, and Inventor to fresh
               graduates and academic lecturers from the Ministry of Higher Education Ma-
               laysia. The facility spans a two-floor commercial lot, covering 6105 square feet.

               The design of the layout was meticulously planned with each floor serving
               distinct functions. The lower floor houses three interconnected computer labs
               with 48 workstations, a cafeteria with seating for 48, discussion rooms, a Muslim                                                                                                                                                                                                                    chairman
               prayer room, a server room, and a storage room. The upper floor accommo-                                                                                                                                                                                                             manager 1  manager 2
               dates two connected seminar rooms for 40 participants, a reception lounge,                                                                                                                                                                                                                                   lounge
               a meeting room, another server and storage room, and a corporate office.

               The  center  was designed to  accommodate  daily training  for  88 par-
               ticipants,  and  office  space  for  12  executives,  five  managers,  and  one
               housekeeper. The design aimed to create a sustainable, productive, and                                                                                                                                                                                                               Director               void
               homely environment.  Aesthetically, the  reception  area featured  laminat-                                                                                                                                                                                                                       Finance/HR
               ed exotic wall panels as a backdrop and a minimalist-designed dropped                                                                                                                                                                                                                                    documentation
               ceiling with L-box lighting.  The  main wall of  the  lounge  areas was paint-
               ed red, complementing the lighting strategy and furniture  arrangement.
                                                                                                                                        07                                                  2ND FLOOR (FURNITURE LAYOUT PLAN)                   3RD FLOOR (FURNITURE LAYOUT PLAN)                 MEZZANINE (FURNITURE LAYOUT PLAN)
               I was solely responsible for the design and project management. The project                                                                                                                                                                                                               1  MEZZANINE F (FURNITURE LAYOUT PLAN)
               involved coordinating with 10 installers and skilled workers stationed onsite,                                                                                                                                                                                                               Scale 1 : 100
               while furniture and fittings tasks were outsourced to third-party contractors.
               The project was completed within three months.
   93   94   95   96   97   98   99   100   101   102   103