Page 36 - MOX STUDIO- 2017
P. 36

36                                                                                                                                                                                                                                                                                                                       37
                                                                                                                                        03








                                                                                  2014.


             DESTINATION PERAK SDN BHD HEAD OFFICE




              LOCATION : LEVEL 11,PTTC TOWER, MERU IPOH, PERAK                                                                                                                                                                                                                MODERN CONTEMPORARY
              CLIENT : PERBADANAN KEMAJUAN NEGERI PERAK (PKNP)
              PROJECT SIZE : 8921 SQFT
                                                                                                                                                                                                                                                                              Contemporary  decorating  style centers on simplicity,
                                                                                                                                                                                                                                                                              subtle elegance, and the careful use of textures and clean
                                                                                                                                                                                                                                                                              lines. It  focuses  on  minimalistic elements,  using  neutral
              In  2014,  my  interior  design  firm  was  awarded  a  contract  by  Destination
              Perak Sdn Bhd, a tourism agency owned by the state of Perak.  The                                                                                                                                                                                               shades  like  grays and beiges, and avoids  unnecessary
              project was located on the 11th floor of the Perak Techno Trade Centre                                                                                                                                                                                          details,  prioritizing a clean and functional design ethos.
              (PTTC)  in Meru,  Ipoh,  Perak,  covering  a space of  7683 square feet.
                                                                                                                                                                                                                                                                              In  this  modern  contemporary  office,  the  design  adopts
              We  initially  planned  to  use  a  site  on  the  17th  floor,  but  the  project  was                                                                                                                                                                         an open space concept, combining the pantry with
              eventually moved to the 11th floor. The original 17th-floor site was a bare unit,                                                                                                                                                                               the  reception,  lobby, and  working  areas.  This  layout
              while the 11th floor contained outdated fittings and furniture from a previous                                                                                                                                                                                  fosters an airy and efficient workspace that shuns overly
              tenant. This necessitated numerous adjustments and improvements to the                                                                                                                                                                                          ornate  elements. Strategically  placing the open pantry
              initial design and work plan. The building’s systems, including the electrical                                                                                                                                                                                  near  the  reception  and discussion areas enhances
              Distribution Board and FCU units, were outdated and partly non-functional,                                                                                                                                                                                      functionality by allowing guests to  transition  smoothly to
              with  a  quarter  of  the  space  cluttered  with  damaged  office  furniture.  It                                                                                                                                                                              the dining area without disrupting the working space.
              took us three weeks to demolish existing partitions, reposition and rewire
              the  Distribution  Board  units,  remove  faulty FCU  units,  and  clear  the  site.
                                                                                                                                                                                                                                                                              Additionally, the use of boxed-up wooden panels not only
              Our goal was to create a modern minimalist/contemporary co-working space,                                                                                                                                                                                       helps in sectioning off different areas but also reinforces
              optimizing existing fittings to reduce renovation costs. As the project leader,                                                                                                                                                                                 the  modern  contemporary  style  throughout  the  office.
              I coordinated our teams—electrical, structural, plumbing, furniture, fittings,                                                                                                                                                                                  This design choice  complements  the  existing wood  wall
              and suppliers—ensuring efficient progress according to the work program.                                                                                                                                                                                        paneling in the Boardroom, creating a cohesive aesthetic.

              Custom-made fittings were produced in our fabrication factory in Kuala
              Lumpur, approximately 150 miles away, and a dedicated team consisting
              of  five  electricians,  five  carpenters,  ten  general  laborers,  and  two  site
              supervisors was stationed  on-site.  The  entire  project  was completed  in
              about  three  months,  including a one-month  period for  addressing any
   31   32   33   34   35   36   37   38   39   40   41