Page 29 - MOX STUDIO- 2017
P. 29

28                                                                                                                                                         29









 2019.
 SANDY BEACH RESORT



 LOCATION : PANTAI CHENANG, LANGKAWI
 CLIENT : SANDY BEACH RESORT OWNER (MR. AZLAN)
 PROJECT SIZE : 5270 SQFT


 The Sandy Beach Resort, ideally  located on Cenang Beach in
 Langkawi, is famed for its pristine white sands, crystal clear waters,
 and stunning sunsets, making it a perfect spot for sunbathing and
 relaxation. Situated close to a vibrant mix of restaurants, bars, ho-
 tels, souvenir shops, and duty-free outlets, the resort ensures guests
 have easy access to a variety of amenities both day and night.

 Recently, the privately owned resort operator engaged my interi-
 or design firm to undertake a refurbishment project for their nearly
 two-decade-old resort. The client specified the need for upgrades
 that align with the standards of a typical 3-Star hotel, focusing on
 the resort rooms and a hotel lounge. The refurbishment was to be mi-
 nor, involving no structural changes, yet comprehensive in scope.

 Our tasks included replacing the plaster ceilings and downlights,   “Sandy Beach Resort strategically located at the
 re-plastering walls, overhauling the electrical wiring, and updat-  best location in Langkawi, Pantai Cenang is the
 ing sockets and switches. Additionally, we installed new air con-  most popular spot among domestic and foreign
 ditioning units, updated the bathroom tiles, sinks, water closets,   tourist all over the world”.
 piping, and water heater systems. The designated areas also re-
 ceived a fresh color scheme along with new furniture and fittings.

 02  half, transforming the resort into a vibrant, contemporary space
 The  project  was completed  in approximately a month  and a
 tailored  to  accommodate  the  needs  of  short-stay  guests.  One
 significant challenge we faced was managing the supply of re-
 sources, as we had to import materials via sea and air freight. The
 logistical difficulties resulted in costs that were up to 300% over the
 client’s initial budget, underscoring the complexities of undertak-
 ing such projects on an island.